Budgeting & Timelines

Below are average bottom-line costs that we often see when completing projects for clients. Project Management pricing is for design and budget planning, scheduling and management of the project to completion. Please note that the size of your space and desired products could affect these estimates.

 

K I T C H E N    R E F R E S H

A Kitchen Refresh usually includes the cabinets refinished, new hardware, counter tops, new lighting and paint and a new kitchen faucet. The basic layout and cabinetry remains the same.

Project Management $1750

Estimated Product and Labor Cost: $12-$15,000

Typical Installation Time:  2 weeks

 

C O M P L E T E   K I T C H E N   D E M O   &  R E N O V A T I O N

This would include demolition of the entire space, re-configuring the layout of your kitchen, all new cabinets, flooring, counter tops, lighting, paint and kitchen faucet.  In some cases, we might be able to include all new appliances in the estimated cost below.

Project Management $3500

Estimated Product and Labor Cost:  $25,000-$30,000

Typical Installation Time:  3 weeks

 

M A S T E R   B A T H    R E F R E S H

Updating cabinets, tile, paint and plumbing fixtures.

Project Management $950

Estimated Product and Labor Cost:  $8500-$12,000

Typical Installation Time:  1.5 weeks

 

C O M P L E T E    M A S T E R   B A T H    R E N O V A T I O N

Complete demolition of the space, re-configuring the layout of your master bath and plumbing, expanding the shower, new cabinets, counter tops, lighting, paint, tile, faucets and flooring.  In some cases a new bathtub and toilet.

Project Management $1800

Estimated Product and Labor Cost:  $15,000-$20,000

Typical Installation Time 2 weeks

 

F U L L   H O U S E   R E N O V A T I O N (2500-3500 sq ft home)

We consider a full-house renovation as complete kitchen (above), complete master (above), a guest bath update, all walls in the house patched and painted (sometimes this can also include new texture on the walls and popcorn ceilings updated), new flooring and baseboards through-out the house.  If relocating, we can also include moving, unpacking and decorating services.

Project Management  $7500

Estimated Product and Labor Cost $85,000-$100,000

Typical Installation Time 4-6 weeks